Thread
:
Zenith Advanced System 3 picture tube testing
View Single Post
#
22
12-30-2013, 03:21 PM
Kevin Kuehn
Workin' Late Again
Join Date: Jan 2011
Location: WI
Posts: 3,976
Thanks for the explanation. Is there a way to safely power the two main boards on the bench without removal of the front switch panel PC board? Any voltage test points to verify correct power supply operation?
Kevin Kuehn
View Public Profile
Find all posts by Kevin Kuehn