|
I've seen some sets where in the ~11 secs it takes for the tubes to warm up the 450V caps get slammed with 500V then as the tubes start to load the rail it drops down to roughly 450V....It has made me ponder making 500V my new higher voltage bulk lytic ordering voltage.
|