View Single Post
  #4  
Old 05-02-2020, 02:58 PM
Jon1967us Jon1967us is offline
VideoKarma Member
 
Join Date: Nov 2018
Posts: 350
Smile Update

So, I found the best way to access the lytics was to carefully unfasten the picture tube retaining brackets and pull the tube forward. As shown, I have it resting on pillows to keep it stable. I pulled off the CRT plug and anode, but didn't remove the Yoke assembly. I'm trying to keep the CRT steady so as not to stress the Yoke leads.

I'm also trying to do the minimum amount of disassembly.

There are 8 electrolytics here, in 3 packages, that are now fairly accessible. I have taken my time on verifying all the respective cap sections, what color leads and where everything goes.

I've decided to go the terminal strip method for 2 out of the 3 and just the single lytic for the doubler, which I may encase in large shrink tubing.

Once the new electrolytics are in place, I will replace the CRT and test.
Attached Images
File Type: jpg IMG_9833.jpg (52.5 KB, 31 views)
File Type: jpg IMG_9834.JPG (139.0 KB, 30 views)
File Type: jpg IMG_9837.jpg (47.7 KB, 26 views)
File Type: jpg IMG_9838.jpg (60.4 KB, 25 views)
File Type: jpg IMG_9853.JPG (135.0 KB, 28 views)
Reply With Quote