View Single Post
  #14  
Old 08-05-2022, 01:21 PM
Penthode's Avatar
Penthode Penthode is offline
VideoKarma Member
 
Join Date: Jun 2009
Location: Kitchener/Waterloo Ontario Canada
Posts: 1,462
Quote:
Originally Posted by Yamamaya42 View Post
In other words... it has piqued your interest!

Could not resist! :P
Brilliant!

Haven't gotten arond to addressing the peaking coild yet. Hopefully this evening.

Neverthe less have been letting the chassis run. I reformed the electrolytics before powering and they seem fine. All the voltages seem correct so far up to the sync separator. I can see composite video on the scope and horizontal sync good. V ertical a bit touchy. Remember I recreated the couplate PC-101 integrator network. Seems the problem goes back to the vertical sync separator where the voltages are a bit low and the sync output appears a bit low.

The HV is holding at 21 kV. The vertical convergengence transformer seems fine so far.

A longer run for over an hour produced the new resistive ballast unit temperature reaching 75 degrees celcius. Too hot to leave your finger on but a lot less than the 125 degrees I measured when it was clamped to the chassis.
Reply With Quote