|
Topside electrolytics C1 (A, B, and C) and C2 (A, B and C) are done. C3 and C4 left to do, then this stage of the task is (finally) done. As viewed from below-chassis (note the perfboard and heat-shrink-tubed wire connections on the lower two circular areas). Details next post.
|