#1
|
||||
|
||||
|
I have completed the paper capacitor replacement as well as the disassembly and reassembly of the IF stages to clean out the mouse nest. Last two remaining jobs:
1) Replace/fix the open peaking coils. 2) Arrive at a solution for the dropping resistors (ballast). Peaking coils: All of the white encapsulated coils are open. The white concrete like covering of the coils was a really bad idea. I managed to salvage two by carefully crunching off the white exterior and fishing for the coil ends. There were signs of green "vertigris" at the wire ends. I managed to find the ends and reattached. However I still need a couple of 1000uH and the 6900uH coils. I reflected on the design and have dismissed the substitution of different coil values. The I and Q channels have predetermined bandwidths of 1.5MHz and 0.5 MHz respectively. The coils in the I and Q channels facilitate the different bandwidths hence the values must be maintained. Further, the wider I channel has a delay inserted to align the narrower Q channel so it is important to ensure the bandpasses remain as designed to minimize display chroma registration and alignment. I am awaiting the delivery of a spool of AWG44 wire and contemplate making some coils myself. Once installed, I shall sweep I and Q channels in the course of overall alignment and testing of the chassis prior to attaching the 15GP22. 2) Ballast Resistor: I have decided to mount the 315 ohm 50W and 800 ohm 25W resistors on a heat sink assembly which will plug into the ballast socket. I decided again using the chassis itself as a heat sink and/or mounting the ballast resistors over or near the selenium rectifiers as I want to keep the heat source isolated as much as possible from the CRT bell. I am concerned the temperature source will be detrimental to the CRT. Also note I decided against using the selenium rectifiers. I have left the rectifiers in situ disconnected and immediately below them have installed a tag strip to which is attached two 3A 800piv rectifiers and a 10 ohm 25W dropping resistor. I shall be assembling the ballast replacement this week. The electrolytic cans all check okay and the capacitors have been reformed. I should be on target for a first power up this next weekend. Last edited by Penthode; 07-25-2022 at 09:26 PM. |
|
#2
|
||||
|
||||
|
I have been making progress with the peaking coils. I have managed to repair three and found a way to accurately measure and recreate the missing coils.
I have been looking for a way to accurately measure peaking coil inductance. The best solution which is repeatable is resonating it against a known capacitance. I am using the setup below. I am series resonating so as I adjust the oscillator, I will find a dip when resonance is found. I am using a 5% 820pF mica capacitor. (I could not find a 1% tolerance cap). The capacitor is slightly higher than 820pF so my readings are consistently a few percent below. But it is close enough. The repaired 1.9mH measured resonance an inductance of 1.85mH. The 820uH inductor measure 800uH. and the 1.0mH coil measure 980uH. So all is good. I am now in a position to recreate the 6.7mH and another 1.0mH to complete the set. When the set is back together, I shall sweep the chroma and luma channels with the new peaking coils to ensure this CTC2 chassis meets spec. Last edited by Penthode; 07-28-2022 at 09:08 AM. |
![]() |
| Thread Tools | |
| Display Modes | |
|
|