![]() |
|
#27
|
||||
|
||||
|
Finally, on to rubbing out the finish. I think 11 months is long enough to let the lacquer cure
![]() ![]() There was a lot of overspray on the sides so I had to start out with some 400 grit first. Then, some 600 grit wet sanding and steel wool. I think in the future I'll make some effort to shield surfaces from overspray to save some time and effort. ![]() Next, pumice stone. I used the opportunity to try out an idea I've had for a while. I haven't found a local source of good felt pads and they can be a little pricy online, so I tried large felt furniture pads. ![]() They actually work pretty well on large flat surfaces, but for angled our curved surfaces the thinner flexible pads are still the way to go. ![]() After about two hours work, one side is done
|
|
|